Planning and Approvals
Compliance mistakes are the most expensive kind — a forced removal or a drainage dispute costs far more than the gravel itself. Work through these before spending anything:
- ☐ Project scope defined (areas, stone type, target depths)
- ☐ Local building/planning department checked — permit needed? Most residential gravel work is exempt, but curb cuts, flood zones, and large grading can trigger review. (See code compliance)
- ☐ HOA approval obtained in writing (if applicable) — color, material, and edging standards vary widely
- ☐ Utility locate called (e.g., 811 in the US) — ticket number saved; it’s free and legally required before digging
- ☐ Septic/drain field locations identified and avoided — compaction over a drain field can destroy it
- ☐ Drainage plan drawn: where does water go now, and where will it go after? Keep runoff on your lot. (See pro tips)
- ☐ Neighbor notification if the work affects a shared boundary, shared driveway, or shared drainage
Measuring and Ordering
Ordering accuracy starts here. Rushing measurement is the single most common cause of short loads and expensive second deliveries:
- ☐ All areas measured twice, in consistent units — a 10% measuring error on a 10-ton order is a full ton
- ☐ Irregular shapes divided into simple sections; L-shapes split so corners aren’t double-counted (estimating guide)
- ☐ Depth selected per application — driveway 10–15 cm (4–6 in) compacted, path 5–7.5 cm (2–3 in), decorative bed 7.5–10 cm (3–4 in)
- ☐ Quantity calculated with the Gravel Calculator, waste/compaction allowance included (10–15%)
- ☐ Tons vs. cubic yards confirmed with supplier; bulk density of the specific product asked (typical 1.4–1.7 tons/yd³)
- ☐ Stone type and size specified in writing (e.g., “¾-in crushed, minus” — not just “gravel”)
- ☐ 2–3 suppliers quoted on delivered price, not material-only; best value chosen (cost guide)
- ☐ Fabric, edging, stakes, and staples ordered alongside the stone — don’t make a second trip
- ☐ Delivery date set; truck access confirmed (3 m / 10 ft width, 4 m / 13 ft height, firm ground for a loaded truck)
- ☐ Dump location agreed with driver; tarp or plywood down to protect the surface underneath
- ☐ Weather checked — avoid delivery-day downpours; wet subgrade plus a heavy truck means ruts
Site Preparation
This is the day that determines whether the gravel lasts two years or ten. Don’t compress it:
- ☐ Area marked out (marking paint, stakes, string lines)
- ☐ Topsoil and organic matter excavated to required depth — organics decompose and leave voids
- ☐ Subgrade compacted with plate compactor or roller; soft spots over-excavated and backfilled
- ☐ Grade established — crown or slope for drainage (2% on driveways ≈ 2 cm per meter; 1–2% on paths away from buildings)
- ☐ Woven fabric (driveways/paths) or non-woven (drainage/beds) laid, 15 cm (6 in) overlaps, pinned with landscape staples
- ☐ Edging installed before stone arrives — steel, timber, or stone, set 1–2 cm above planned finished height
- ☐ Tools staged and ready: rakes, shovels, wheelbarrow, plate compactor (rented), hose, level, string line
- ☐ Help arranged if the load is large — moving 10+ tons solo is a multi-day job
Installation Day
Work in lifts, check grade as you go, and don’t rush the compaction:
- ☐ First lift spread (half of total depth for fills over 10 cm / 4 in)
- ☐ First lift lightly dampened (for crusher run) and compacted
- ☐ Second lift spread to full finished depth
- ☐ Crown/slope verified with a level or string line before final compaction
- ☐ Final compaction pass; surface checked for soft spots or thin areas
- ☐ Edges tucked firmly against edging — no gaps where stone can escape
- ☐ No fabric visible anywhere; no thin spots showing through
- ☐ Surrounding lawn, beds, and hardscapes cleaned; stray stone swept up
- ☐ Truck departure checked — no damage to driveway, lawn, or gate from the delivery
Installation technique details are in pro tips; errors to watch for in common mistakes.
After Completion
- ☐ Leftover stone stockpiled on a tarp (covered) for future top-ups — half a ton now beats a delivery fee later
- ☐ Receipts and material specs filed (useful for warranty or drainage questions)
- ☐ Before/after photos taken — valuable for any future runoff or boundary discussion
- ☐ First heavy rain observed: any puddling, washout, or migration? Re-grade promptly while it’s easy
- ☐ Weed check after 4–6 weeks: any breakthrough gets pulled before roots establish
- ☐ Maintenance scheduled: spring raking to redistribute, top-up every 2–3 years, edging inspection annually
Common Oversights (Why Checklists Exist)
The items people skip most often — and pay for later:
- Fabric seams butted instead of overlapped: weeds find every gap within a season. Overlap 15 cm minimum.
- Edging set flush instead of slightly proud: the first heavy rain carries stone right over it.
- Crown eyeballed instead of measured: a “flat-looking” drive ponds water. Use a string line.
- Compactor booked for one day: if spreading runs long, the rental clock does too. Book two days.
- Street/sidewalk not swept: stone left on public areas draws complaints or fines — clean up before the truck leaves.
Materials Quick Reference
- Driveway: ¾-in crushed or crusher run, 10–15 cm compacted — material guide
- Path/patio: pea gravel or decomposed granite, 5–7.5 cm
- Decorative bed: river rock, 7.5–10 cm
- Drainage: washed #57 stone, per design
Related Guides
- Gravel Calculator: The Complete Guide
- Gravel Estimating Guide
- Gravel Calculator: Pro Tips
- Gravel Cost Guide
- Gravel Calculator FAQ
Start With the Number
Everything on this list flows from an accurate quantity — get yours from the Gravel Calculator, then work the checklist top to bottom. Check off each item as you go; the few minutes of discipline here prevent the expensive surprises that derail gravel projects. And keep the list for next time — the second project goes twice as fast when the first one taught you the sequence.
Disclaimer: This checklist is general guidance for residential gravel projects. Local regulations, site conditions, and project requirements vary — verify with your local authority and supplier. Calculator results are planning estimates.