Introduction
A re-roofing project has dozens of small decision points, and the expensive failures — wrong materials delivered, missing permits, skipped inspections — are almost always things someone forgot to confirm, not things nobody knew. This checklist organizes everything into three phases: before work starts, while it’s underway, and after it’s done. Print it, work it top to bottom, and nothing structural gets missed.
The Roofing Cost Calculator covers the quantities side: roof area in squares and square meters, bundle counts, and a cost estimate from your measurements. This checklist covers everything around the quantities — the paperwork, the decisions, and the verifications that turn an estimate into a finished roof.
Phase 1: Before Work Starts — Measure and Plan
- Sketch the roof as seen from above, marking every plane, valley, hip, dormer, chimney, and skylight.
- Measure the footprint at the roof edge (not the wall line), per rectangle, using the estimating guide method.
- Measure the pitch for each plane — attic level-and-tape method preferred; never guess.
- Count existing shingle layers at a roof edge; confirm whether tear-off is optional or mandatory under local layer caps.
- Photograph every penetration and detail — chimneys, vents, skylights, wall intersections — for quote requests.
- Run the calculator with your measurements to establish squares, bundle counts, and a baseline cost estimate.
- Choose the waste allowance honestly: 10% simple gable, 12–15% cut-up roof.
- Shortlist the material family using the material guide — lifespan, weight, climate, and code fit.
- Verify code requirements with the local building authority: permits, layer limits, ice barriers, wind ratings, fire ratings (code compliance guide).
- Decide DIY vs. pro scope honestly, with safety as the deciding factor for anything steep or multi-story (DIY vs pro guide).
Phase 2: Hiring and Contracting
- Collect at least three itemized quotes against identical scope: named materials by brand and line, tear-off depth, accessories, ventilation.
- Verify license and insurance — independently, not on the contractor’s word.
- Check references from local jobs completed in the last year.
- Confirm the contract specifies: exact materials, tear-off scope and disposal, underlayment type, ice shield (if applicable), flashing replacement, ventilation work, cleanup standards, payment schedule, and start/completion dates.
- Clarify both warranties in writing: manufacturer’s material warranty terms and the contractor’s workmanship warranty length and coverage.
- Agree deck-repair pricing upfront — per-sheet or per-linear-foot rates for sheathing replacement, so tear-off discoveries don’t become open-ended change orders.
- Confirm who pulls the permit and that inspections are scheduled.
- Set the contingency: 10–15% above the contract price, reserved for deck surprises.
- Never pay in full upfront. A deposit plus progress payments tied to milestones, with final payment after passed inspection, is the standard protective structure.
Quote-reading technique and budget structure are detailed in the cost guide; negotiation and timing tactics in the pro tips guide.
Phase 3: Materials and Site Prep
- Verify the delivery against the contract: right manufacturer, product line, color, and bundle count (compare to your calculator output).
- Confirm accessory quantities: underlayment rolls, ice shield, ridge cap, drip edge, flashing, vents, nails.
- Protect the property: move patio furniture and vehicles, cover landscaping near the eaves, protect AC units.
- Notify neighbors of the work dates — tear-off is loud and starts early.
- Arrange attic protection: cover stored items; dust and debris will fall through during tear-off.
- Confirm dumpster placement and that it won’t block access you need.
- Designate a daily contact — know who supervises on-site and how to reach them.
Phase 4: During Installation — Daily Verifications
- Deck inspection at tear-off: look at the exposed deck (from the attic or photos) for rot or damage before it’s covered; confirm repair scope matches the pre-agreed pricing.
- Underlayment check: correct type installed, proper overlaps, ice shield at eaves/valleys if specified.
- Flashing: new flashing at chimneys, walls, and penetrations — not reused old flashing unless explicitly agreed.
- Nailing pattern: spot-check that fasteners follow the manufacturer’s spec (count and placement), especially in high-wind zones.
- Ventilation: ridge vent cut open (not just laid over solid decking), intake vents clear.
- Weather watch: confirm the crew’s plan for securing the roof if weather turns — exposed deck overnight needs proper covering.
- Daily cleanup: nails and debris magnet-swept daily, not just at the end.
Phase 5: Final Inspection and Closeout
- Walk the roofline from the ground: straight courses, aligned ridge caps, uniform appearance.
- Check every penetration: boots sealed, flashing properly stepped and counter-flashed at chimneys and walls.
- Verify drip edge at all eaves and rakes.
- Confirm vents are functional: exhaust vents cut through, intake vents unobstructed.
- Gutters and yard: gutters clear of debris, full magnetic nail sweep of lawn, driveway, and planting beds.
- Passed building inspection: confirm the permit inspection is signed off before final payment.
- Collect paperwork: final invoice, both warranties in writing, product documentation, permit/inspection records.
- Photograph the finished roof from the same angles as your “before” photos — your baseline for future damage claims.
- Store spare bundles (same dye lot) flat in a dry place for future repairs.
- Release final payment only after inspection passes and the punch list is complete.
Related Guides
- Pro Tips — trade-style advice for measuring, ordering, and timing a re-roof.
- Estimating Guide — how to measure a roof’s footprint and pitch accurately from the ground.
- Code Compliance — permits, layer limits, ice barriers, and wind ratings to verify locally.
- DIY vs Pro — where DIY roofing stops and a contractor becomes the right call.
- Cost Guide — what each line of a roofing quote covers and how to budget for it.
Frequently Asked Questions
When should final payment be made?
After the building inspection passes and your punch list is complete — never before. The contract’s payment schedule should reflect this; final payment is your last leverage for corrections.
What paperwork should I keep?
The signed contract, itemized quote, permit and inspection records, both warranties, product documentation (brand, line, color), and before/after photos. Keep them with the house records — they matter for insurance claims and resale.
How do I know the deck repairs were really needed?
Ask to see the damage before it’s covered — photos at minimum, an attic-side look at best. Pre-agreed per-unit repair pricing in the contract removes the incentive to invent damage.
What if it rains mid-installation?
Professional crews monitor forecasts and secure exposed sections with tarps or underlayment at day’s end. If your contract lacks a weather plan, add one before work starts — a soaked deck or interior leak is the preventable disaster.
Work the List, Then Enjoy the Roof
Checklists exist because memory doesn’t scale to forty-item projects. Measure carefully, contract precisely, verify daily, and close out completely — and start the whole process with solid numbers from the Roofing Cost Calculator. A roof installed to this standard doesn’t just pass inspection; it earns its full lifespan.
Disclaimer: Calculator results are planning estimates based on the dimensions and rates you enter. This checklist is general guidance, not a substitute for professional advice. Actual roofing costs vary with material choice, labor rates, roof complexity, deck condition, and local requirements. Get itemized quotes from licensed contractors and verify permit and code requirements with your local building authority before committing to a project.