Introduction
Chain link jobs go wrong in the planning stage and get discovered in the field — a missing tension bar, an unmarked utility line, concrete ordered a day late. This checklist covers everything to verify before work starts: paperwork, measurements, materials, tools, and site prep. Print it, walk it, check each box.
The material quantities on your list should come from the Chain Link Fence Calculator — rolls, posts, rail, tension wire, and concrete from your fence length and height. The checklist below makes sure everything around those numbers is ready too.
Paperwork and Permissions
- ☐ Property line verified (survey pins, plat, or licensed surveyor — not the old fence)
- ☐ Municipal permit obtained, if required for your height and location
- ☐ HOA/architectural approval in writing, if applicable
- ☐ Utility locate requested and completed (811 or local equivalent) — marks respected
- ☐ Neighbor notified, if the fence runs along a shared line (not always legally required; always wise)
- ☐ Contractor license/insurance verified, if hiring — contract signed with specs in writing
What typically requires permits and where the final answers live is covered in the code compliance guide.
Measurements Verified
- ☐ Fence line walked and every direction change flagged
- ☐ Each straight run measured separately along the ground and recorded on the sketch
- ☐ Gate openings measured (clear width between gate-post faces) and recorded per run
- ☐ Total fence length reconciled against a rough perimeter check
- ☐ Fence height confirmed against permit/HOA limits
- ☐ Post positions marked at true 10-ft centers; count reconciled with run length ÷ 10 + 1
- ☐ Shared corners counted once (sketch numbered, no double-counts)
The field technique for each of these is in the estimating guide.
Materials On Site
- ☐ Mesh rolls: (fence length − gate widths) ÷ 50, rounded up — correct height and gauge
- ☐ Line posts: count from marked positions — correct length (height + burial + clearance)
- ☐ Terminal posts (corners/ends): heavier pipe, correct length
- ☐ Gate posts: 2 per gate, heaviest pipe, correct length
- ☐ Top rail sticks: (fence length − gate widths) ÷ stick length, rounded up
- ☐ Bottom tension wire: coil sized above fence length
- ☐ Concrete: bags per the hole math (line holes ~2.5 sixty-lb bags; terminal holes ~5.25) — plus a few spare
- ☐ Tie wires: ~1 per 12–16 in per post + rail ties, plus 10% spare
- ☐ Tension bars: 1 per fabric end (2 per roll)
- ☐ Tension bands, brace bands, rail ends/sleeves, post caps — counted from post and roll totals
- ☐ Gate frame kit(s) with hinges, latch, and drop rod — sized to the finished opening
- ☐ Coating matched across fabric, posts, and rail (galvanized / vinyl-coated color)
What each component does and how to choose between options is in the material guide; typical prices are in the cost guide.
Tools Ready
- ☐ Post-hole digger (manual) or powered auger reserved for dig day
- ☐ Come-along + tension bar for stretching
- ☐ 100-ft tape, mason’s string, stakes, marking paint
- ☐ 4-ft level, post level optional
- ☐ Bolt cutters / fence pliers, wire cutters
- ☐ Wheelbarrow, shovel, mixing tub or hoe (for bagged concrete)
- ☐ Water source at the site for concrete mixing and curing
- ☐ Second person confirmed for stretch day (minimum two people)
Site Prep
- ☐ Fence line cleared of brush, debris, and obstructions
- ☐ Material delivery/staging area designated (rolls are heavy — stage near the work)
- ☐ Dig-day weather checked — avoid pouring footings into frozen ground or ahead of heavy rain
- ☐ Concrete cure window planned: 24–48 hours minimum before tensioning fabric
- ☐ Old fence demolition/disposal arranged, if replacing
Install Sequence (Day-Of Order)
- Confirm utility marks still visible; re-mark post positions if needed
- Dig holes — bell the bottoms, confirm depths (24–36 in typical, deeper for gates)
- Set terminal posts first (corners, ends, gate posts) — plumb, concrete domed to shed water
- Set line posts on the string line — plumb, tops at consistent height
- Cure: no tensioning until concrete has set 24–48 hours
- Hang top rail; run bottom tension wire
- Unroll fabric knuckle-up; stretch with come-along and tension bar; tie off at terminals
- Tie fabric to line posts (12–16 in) and rail (24 in); attach tension wire with clips
- Fit and hang gates last, to the finished opening
- Walk the line: check tension, ties, caps, clearances, and gate swing
Technique details for the stretching and hanging phases are in the pro tips guide, and the errors this sequence prevents are in the common mistakes guide.
Related Guides
- Chain Link Fence Calculator FAQ — quick answers to the most asked questions.
- Complete Guide — the full estimating walkthrough with a worked example.
- Estimating Guide — how to measure your fence line correctly.
- Pro Tips — stretching, tensioning, and install-day advice.
- Code Compliance — permits, inspections, and local requirements.
Frequently Asked Questions
What should I do first — permit or measurements?
Measurements first (you need them for the permit application), then permit/HOA approval, then material order. Never order material before approvals are in hand — a required height change alters the whole list.
How far ahead should I call for utility locates?
Several business days before dig day — requirements vary, but 3–5 business days is typical. The marks are usually valid for a limited window, so don’t call weeks early either.
Can I dig and set posts in one day?
Yes for the digging and setting — but tensioning the fabric waits for the concrete to cure (24–48 hours). Plan dig-and-set as one phase and stretch-and-hang as a later phase.
What’s the most commonly forgotten item?
Small hardware: tension bars, rail sleeves, and enough tie wires. The big materials (rolls, posts, concrete) get counted; the fittings get assumed. Count them from the post and roll totals.
Should gates be on the checklist before install day?
Yes — gate kits ordered and on site, but hung last. The opening gets measured after posts are set; the gate gets fitted to that real measurement.
Get Your Number
Checklists only work when the numbers they’re checking are right. Run your fence length, height, and gates through the Chain Link Fence Calculator, reconcile every line against the boxes above, and don’t start digging until every box is checked. An hour with this list beats a weekend fixing what it would have caught.
Disclaimer: Calculator results are planning estimates based on the dimensions you enter. Actual material needs vary with site conditions, slope, gate hardware, and installation method. Verify quantities with your supplier and consult a licensed professional or your local building authority for code-related decisions.